Polypropylene Fusion Flange Stub End - Resistant is a product in the pipe fittings family for fluid conduction in polypropylene. 18 sizes published with per-variant price and availability. Fusion connection. Price from $ 12.700 COP before VAT.

| SKU | Size | Unit price (from) | Availability | Qty | |
|---|---|---|---|---|---|
| VT-92401-01 | 1" | $ 12.700 * | In stock | ||
| VT-92401-02 | 1-1/4" | $ 12.700 * | Made to order | ||
| VT-92401-03 | 1-1/2" | $ 12.700 * | Made to order | ||
| VT-92401-04 | 2" | $ 12.700 * | Made to order | ||
| VT-92401-05 | 2-1/2" | $ 12.700 * | In stock | ||
| VT-92401-06 | 3" | $ 12.700 * | Made to order | ||
| VT-92401-07 | 4" | $ 12.700 * | In stock | ||
| VT-92401-08 | 5" | $ 12.700 * | Made to order | ||
| VT-92401-09 | 6" | $ 12.700 * | Made to order | ||
| VT-92401-10 | 1" | $ 12.700 * | Made to order | ||
| VT-92401-11 | 1-1/4" | $ 12.700 * | Made to order | ||
| VT-92401-12 | 1-1/2" | $ 12.700 * | In stock | ||
| VT-92401-13 | 2" | $ 12.700 * | Made to order | ||
| VT-92401-14 | 2-1/2" | $ 12.700 * | Made to order | ||
| VT-92401-15 | 3" | $ 12.700 * | Made to order | ||
| VT-92401-16 | 4" | $ 12.700 * | In stock | ||
| VT-92401-17 | 5" | $ 12.700 * | Made to order | ||
| VT-92401-18 | 6" | $ 12.700 * | Made to order |
Prices per size, per unit, before VAT. Confirmed in the quote together with shipping. Sizes marked with * show the base reference price.
| Family | Pipe fittings |
| Material | Polipropileno |
| Connection | Fusion |
| Availability | Made to order |
| Factory PDF data sheet | Available from an advisor |
PPR Fusion Flange Stub End is a TECTUL fitting used to transition from heat-fused PPR pipe to a flanged connection, valve, pump or detachable equipment. It is intended for industrial buyers who need to quickly identify size, connection and function without confusing it with similar references from the same family. Its main material is polypropylene and its key difference is a neck for heat fusion that works with a loose flange, different from a PPR union. When the project requires dimensional standard, exact material, seal or certification, selection must be confirmed with the technical datasheet before purchase. To quote correctly, it is not enough to request the diameter: it is useful to report fluid, temperature if applicable, pipe type, installation orientation, quantity and whether the point will be fixed, detachable, welded, cemented, threaded or flanged. We do not publish a single maximum pressure because performance depends on the complete line design, seals, temperature, joining method, support and commissioning tests.
| Reported real size | Presentation |
|---|---|
| 1" | Confirm when quoting |
| 1-1/4" | Confirm when quoting |
| 1-1/2" | Confirm when quoting |
| 2" | Confirm when quoting |
| 2-1/2" | Confirm when quoting |
| 3" | Confirm when quoting |
| 4" | Confirm when quoting |
| 5" | Confirm when quoting |
| 6" | Confirm when quoting |
Before using these data in engineering decisions — design, installation or systems with mechanical risk of pressure, rupture, fatigue, impact or water hammer — you must read the Technical notice and limitation of liability at the end of this page.
We dispatch to Bogotá, Medellín, Cali, Barranquilla and all of Colombia. Request a quote via WhatsApp for this PPR fusion flange stub end indicating size, quantity, required material, connection and use to confirm availability and price.
The price depends on size, material, connection, quantity and availability. At TECTUL we quote with the real installation data to avoid reference errors.
The flange stub end requires flange, gasket and bolts defined by the assembly; the kit with union integrates a different detachable solution.
Heat-fuse without misaligning the neck, install a compatible gasket and tighten bolts gradually so the assembly does not ovalize.
Send size, quantity, material, connection type, fluid, a photo of the point if it is a replacement and any project standard or requirement.
No. Compatibility of material, seals, joining method and operating conditions must be validated with the fluid and system temperature.
Yes. TECTUL dispatches to Bogotá, Medellín, Cali, Barranquilla and other cities in Colombia according to availability and carrier.
Before using these data in engineering decisions — design, installation or systems with mechanical risk of pressure, rupture, fatigue, impact or water hammer — you must read the Technical notice and limitation of liability at the end of this page.
Carbon Steel SCH 40 Butt-Weld Elbow✔️economical
Rigid Grooved Coupling
Stainless Steel Threaded Elbow
Stainless Steel Threaded Union
Stainless Steel Wall Sleeve with Threaded EndsUpdated: July 22, 2026
The dimensions, thicknesses, pressures, temperatures and other characteristics stated in this data sheet are theoretical nominal reference values, compiled from publicly available technical sources: international standards (ASME, ASTM, API, MSS, ISO and NTC, depending on the product) and published engineering literature. They are average approximations intended to guide selection, not a certificate of conformity for any given lot.
Actual values may vary due to conditions inherent to the manufacturing process — dimensional and wall-thickness tolerances (in pipe, typically ±12.5%), surface finish and residual stresses from forming or welding — and to factors inherent to the raw material — chemical composition variations within the ranges allowed by the standard, inclusions or heat-to-heat differences. They may also be affected by in-service events not foreseeable at design time: water hammer, vibration, thermal and mechanical fatigue, corrosion and operating overpressures, which can cause the element to fail before its estimated service life.
To know the certified behavior of a specific lot, TECTUL supplies upon request the manufacturer's mill test certificate (MTC) issued per the product standard; for critical applications, laboratory testing of the lot can also be arranged. In the absence of such certification, the data provided here must not be used as the sole criterion in critical or safety applications, or wherever the integrity of the line may compromise the lives of people or property; in such cases, consult our technical team first.